Skip to main content
+91 44 2480 7511
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro compaction
        • Vibro stone columns
        • Dry soil mixing
        • Wet soil mixing
        • Rapid impact compaction (RIC)
      • Heavy foundations
        • Bored piles
        • CFA piles (auger cast)
        • Driven precast piles
        • Driven cast in-situ piles
      • Earth retention
        • Anchors
        • Diaphragm walls and barrettes
        • Contiguous piles
        • Micropiles
      • Grouting
        • Compaction grouting
        • Permeation grouting
        • Jet grouting
        • Compensation/ fracture grouting
      • Near shore marine
        • Jetty construction
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
      • Earth retention and shoring
      • Groundwater control
      • Marine structures
    • Markets
      • Commercial and residential
      • Industrial and manufacturing
      • Infrastructure
      • Hydro and irrigation
      • Institutional / public
      • Oil and gas
      • Ports and harbour
      • Power and renewables
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Safety and wellbeing
    • Quality
    • Diversity, equity and inclusion
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (120)
  • Content page (25)
  • Project (19)
  • Resource (19)
  • Technique (19)
  • News article (16)
  • Market (8)
  • Solution (5)
  • Landing page (3)
  • Office (3)
  • Vacancy (2)
  • Event (1)
Request a quote
Get assistance
Ground improvement for storage tank farms
Project
Ground improvement for storage tank farms Using local capability and specialised geotechnical knowledge, our vibro stone column solution addressed settlement and stability requirements whilst saving…
/projects/ground-improvement-storage-tank-farms
Ground anchoring for metro stations
Project
Ground anchoring for metro stations In this project, Keller designed and executed anchors for the retention system for a 20m deep excavation with high differential water pressure (19 meters water…
/projects/ground-anchoring-metro-stations
Optimal foundation solution for a chemical plant
Project
Optimal foundation solution for a chemical plant Keller’s ability to install a range of ground engineering techniques helped provide optimal foundation solution for this project, saving project time…
/projects/optimal-foundation-solution-chemical-plant
Ground improvement using vibro stone columns for a 6,000mw UHVDC plant
Project
Ground improvement using vibro stone columns for a 6,000mw UHVDC plant Keller’s optimised vibro stone column solution limited settlement to permissible limits, achieved liquefaction mitigation and…
/projects/ground-improvement-using-vibro-stone-columns-6000mw-uhvdc-plant
Heavy foundations for 2x660mw thermal plant
Project
Heavy foundations for 2x660mw thermal plant Keller’s expertise in performing complex and large foundation works (installing 3,000 bored piles) ensured this project was delivered within a tight time…
/projects/heavy-foundations-2x660mw-thermal-plant
Ground improvement using vibro stone columns for 1.25 MMTPA PTA plant
Project
Ground improvement using vibro stone columns for 1.25 MMTPA PTA plant Keller efficiently installed and monitored vibro stone columns for the large diameter steel tank foundations with variable ground…
/projects/ground-improvement-using-vibro-stone-columns-125-mmtpa-pta-plant
Heavy foundations to support LNG storage tanks
Project
Heavy foundations to support LNG storage tanks Micro planning of this project, delivered directly for the principal EPC contractor, allowed us to perform piling and column works simultaneously and…
/projects/heavy-foundations-support-lng-storage-tanks
Ground improvement for an LNG regasification terminal
Project
Ground improvement for an LNG regasification terminal Keller used vibro techniques rather than conventional piles for the foundations at this regasification terminal, with our global engineering…
/projects/ground-improvement-lng-regasification-terminal
Ground improvement for port terminal facilities
Project
Ground improvement for port terminal facilities Keller's innovative ground improvement design for this project satisfied the technical performance requirements, the cost budget, and the overall…
/projects/ground-improvement-port-terminal-facilities
Ground improvement for airport parking bays
Project
Ground improvement for airport parking bays Keller successfully executed ground improvement works for an airport parking project in Cochin, Kerala. Vibro stone column were installed to improve the…
/projects/ground-improvement-airport-parking-bays
Retention system solution for an IT hub
Project
Retention system solution for an IT hub Keller successfully executed a complete foundation package achieving quality and safety compliance throughout the 4.5 million safe man hours. Keller's…
/projects/retention-system-solution-it-hub
Optimal foundation for a phenol processing plant
Project
Optimal foundation for a phenol processing plant Keller's engineering excellence and wide portfolio helped provide a mix of ground engineering techniques to suit different soil conditions and…
/projects/optimal-foundation-phenol-processing-plant
Diaphragm wall construction for an underground metro project
Project
Diaphragm wall construction for an underground metro project Keller completed this critical project in a highly congested environment on time receiving awards from the client and Indian government…
/projects/diaphragm-wall-construction-underground-metro-project
Ground improvement for a locomotive factory
Project
Ground improvement for a locomotive factory Keller’s innovative vibro compaction solution suited the subsoil conditions on this project, helped provide a cost and time effective solution, and had a…
/projects/ground-improvement-locomotive-factory
Construction of bulk berth 3 at Kattupalli, Tamil Nadu
Project
Construction of bulk berth 3 at Kattupalli, Tamil Nadu Keller constructed a multipurpose marine jetty (300m x 40m) resting over 1.4m diameter deep bored cast in-situ piles including more than 1,000…
/projects/construction-bulk-berth-3-kattupalli-tamil-nadu
Foundations for grain storage silos
Project
Foundations for grain storage silos Keller's use of deep vibro techniques - vibro stone columns and vibro compaction at various location in Punjab, Uttar Pradesh, Bihar and West Bengal, is a…
/projects/foundations-grain-storage-silos
Toppan Bopp Line 6
Project
Toppan Bopp Line 6 Keller sucoessfully executed ground improvement works using vibro stone columns for Toppan Specialty Films (TSF), reaffirming its expertise and long-standing client relationships.…
/projects/toppan-bopp-line-6
22.5 TPD compressed biogas plant
Project
22.5 TPD compressed biogas plant Keller successfully delivered an optimal and sustainable foundation solution to support the proposed large size digester structures of Compressed Biogas plant. The…
/projects/225-tpd-compressed-biogas-plant
Water block package, HRRL
Project
Water block package, HRRL Keller successfully delivered an optimal and sustainable foundation solution to support the proposed units-RWTP (Raw Water Treatment Plant), RO-OM (Reverse Osmosis-…
/projects/water-block-package-hrrl
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller India

Registered in Chennai No: U45200TN2006PTC060299
Registered office: 7th floor, Eastern Wing,
Centennial Square, 6A, Dr Ambedkar Road,
Kodambakkam, Chennai - 600024

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube